26.03.01.06

.06 Flow Data.

For each service area, flow data for all community and multi-use sewerage facilities will be presented according to either Table No. 15 for wastewater treatment plants or Table No. 15A for all principal collector sewers, interceptors, pumping stations, and associated force mains. Information presented previously in either Table No. 9 or Table No. 10 can be omitted from Table No. 15. In Table No. 15A, present data according to the flow pattern of existing sewerage system by starting with principal collector sewers and proceed to the treatment plant.

Table No. 3
Projected Water Supply Demands and Planned Capacity
Service Area Present 1975 1980 1990 2000
Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity
total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned
——————
Table No. 4
Inventory of Existing Community System Wells
Well Name
or Number
Aquifer Coordinate
Location
Depth
Feet
Diameter
Inches
Max. Safe
Yield
Pumping
Capacity
Water
Quality
Municipal (Public)
Industrial
Private Community/Institutional
——————
Table No. 5
Inventory of Existing Impounded Supplies
Owner Crest
Elevation
(above sea level)
Spillway
Length
Total Length of Dam Height of Crest Above Stream Bed Flooded Area of Crest Elevation Length of Shore Line at Crest Elevation Water Overflowed Crest for First Time Capacity of Reservoir Safe Yield (MGD) Average Daily Withdrawal (MGD)
Municipal (Public)
Industrial
Private Community/Institutional
——————

Table No. 6
Inventory of Existing Water Treatment Facilities

Owner Water Source Type Treatment Plant Coordinate Location Rated Plant Capacity (MGD) Average Production (MGD) Max Peak Flow
(MGD)
Storage
Capacity
(MGD)
Planned Expansion MGD/Dates Method of Sludge Disposal Operating Agency
Municipal (Public)
Industrial
Private Community*/Institutional

* If transfer to public ownership is recommended, indicate expected date.

——————
Table No. 8
Immediate, 5 and 10 Year Priorities for Water Development
Estimated Costs* Project Status
Constr. Start
Fiscal Year
and
Project Number
County
Priority
Assigned
Coordinate
Location
Description Total Federal
and/or
State
Local Immediate
Priority
Projects
5 and 10 Year
Period Projects
______Year

* Based on dollar values as of effective date of plan where applicable.

——————
Table No. 9
Projected Sewerage Demands and Planned Capacity
Service Area Present 1975 1980 1990 2000
Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity Population GPCD Capacity
total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned total served unserved (gals) demand planned
——————
Table No. 10
Inventory of Existing Water Treatment Facilities
Owner Type Treatment Plant Coordinate Location Occupied Acres Vacant Acres Point of Discharge* Max Site Capacity
Secondary
Max. Site Capacity (MGD) Advanced Existing (MGD) Capacity Flows (MGD)
Average Peak
Planned or Expected Abandonment Date of Interim MGD Date Operating Agency
Municipal
(Public)
Industrial
Private Community**/
Institutional

** If transfer to public ownership is recommended, indicate expected date.

——————
Table No. 11
Problem Areas Inventory - Individual and Community
Service Area Problem
Description
Location Population Acres Treatment Capacity Treatment Demand Planned
Correction
Date if Known
——————
Table No. 12
Water Quality Problem Due to Storm Drainage Outfalls and to Non-point Sources
Service Area Problem Description Location Reach Affected
——————
Table No. 13
Immediate 5 and 10 Year Priorities for Sewerage Development
Costs** Projected Schedule***
Fiscal Year and Project Number County Priority
Assigned
Coordinate* Location Description Total PL 660 Eligibility Other Federal Local Preliminary Plans Financial Plans Start Construction Complete Construction
_____Year
_____Year

* Where applicable for both treatment facility and point of discharge location.

** Based on real dollar values.

*** Month and year—for the last 5 years the "Construction Schedule Column" and need not be filled in.

Table No. 14 Water and Sewerage Map Symbols

——————
Table No. 15
Flow Data
Wastewater Treatment Plants
Design Parameters Flow Development Occupancy Units (1)
Name or
Service Area
Hydraulic
 (mgd)
Organic
(ppm)
Avg. Day*
(mgd)
Max. Day
& (Date**)
Existing* Anticipated***
BPI
PWA
BOD SS   UC NUC
Example: 117 R 7 R 830 R
Clear Water

3.5

200 200

3.0

5.5(3-17-76) 6,500 7 C none none

* Per Effective Date of Plan (7-1-76)

** During Previous Fiscal Year

*** List Residential (R) Separately from Commercial (C) and Industrial (I)

BPI—Building Permits Issued Per Effective Date of Plan

UC—Building Permits Issued Per Effective Date of Plan for Units under Construction

NUC—Building Permits Issued Per Effective Date of Plan for Units not under Construction

PWA—Building Permits for Unexpired Public Works Agreements Per Effective Date of Plan

(1) —Includes Industrial, Commercial and Residential Units

——————
Table No. 15A
Flow Data
Collector Sewers, Inceptors, Pumping Stations and Force Mains
Name or Sewer Type Designation Sewer Capability
Pumping Station
Force Main
Diam.
(Inches)
Flow,
Avg.
Day*
mgd
Design
Number of Pumps Capacity of Each Pump
(mgd)
Normal Pumping
Capacity (mgd)
Avg. Day Pumpage* (mgd) Max. Day
Pumpage
and Mgd
(date)**
Diam. (inches) Design FLow (mgd)
Example:
Collector
12 0.5 1.0
Clear Branch Interceptor 18 3.5 5.0
Severn Run
P.S. and
2 3.6 3.6 2.5 3.0
(3-1-76)
F.M. 24 8.0
Clear Water
STP
(See Table No. 15)

* Per Effective Date of Plan (7-1-76)

** During Previous Fiscal Year