20.79.04.00.htm 20.79.04.00. Title 20 PUBLIC SERVICE COMMISSION Subtitle 79 APPLICATIONS CONCERNING THE CONSTRUCTION OR MODIFICATION OF GENERATING STATIONS AND OVERHEAD TRANSMISSION LINES Chapter 04 Details of Filing Requirements ― Transmission Lines Authority: Public Utilities Article, §2-121 and 7-205―7-208, Annotated Code of Maryland
20.79.04.01.htm 20.79.04.01. 01 Purpose and Justification.. A. An application for a proposed transmission line or modification to an existing transmission line shall include:1) An explanation of the need for the project in meeting demands for service;. 2) A description of the effect of the project on system stability and reliability;. 3) A description of the consequences if the project is delayed or not approved;. 4) An explanation of the cost effectiveness of the project, including an es
20.79.04.02.htm 20.79.04.02. 02 Description of Transmission Line.. The description of a proposed transmission line or modification to an existing transmission line shall include, to the extent feasible at the time of application, the:A. Engineering and construction features, including the:. 1) Width, length, and total acreage of the right-of-way;. 2) Line voltage;. 3) Number of circuits;. 4) Number of circuits per structure;. 5) Structure type and dimensions;. 6) Conductor configuration and size;.
20.79.04.03.htm 20.79.04.03. 03 Alternative Transmission Line Routes.. A. The description of each alternative route considered for the transmission line shall include:. 1) An estimate of the capital and annual operating cost of each alternative route; and. 2) A statement of the reason why each alternative route was rejected.. B. For modifications to existing transmission lines, alternative routes need not be evaluated..
20.79.04.04.htm 20.79.04.04. 04 Environmental Information.. The environmental information shall include:. A. A general description of the physical, biological, aesthetic, and cultural features, and conditions of the site and adjacent areas;B. A summary of the environmental and socioeconomic effects of the construction and operation of the project, including a description of the unavoidable impacts and recommended mitigation;C. A copy of all studies of the environmental impact of the proposed projec
20.79.04.9999.htm 20.79.04.9999. Administrative History Effective date: February 10, 1997 (24:3 Md. R. 189). Regulation .01 amended effective November 8, 2004 (31:22 Md. R. 1598). Regulation .02D amended effective November 8, 2004 (31:22 Md. R. 1598). Regulation .03A amended effective November 8, 2004 (31:22 Md. R. 1598).