Skip to Main Content
<< Back | Return to Main COMAR Search Page

7 records match your request.

FileAbstract
08.08.07.00.htm 08.08.07.00. Title 08 DEPARTMENT OF NATURAL RESOURCES Subtitle 08 DEEP CREEK LAKE Chapter 07 Removal of Docks, Mooring Buoys, Structures, and Facilities Authority: Natural Resources Article, ยง5-209 and 5-215, Annotated Code of Maryland
08.08.07.01.htm 08.08.07.01. 01 Lapse, Revocation, or Other Termination of Permits.. A. Upon lapse, revocation, or other termination of a permit, a permanent structure or facility under the permit shall remain with the land unless the Department orders removal in writing for the following reasons:1) The Department determines that the structure or facility is or may become a safety hazard;. 2) The Department determines that the structure or facility is or may become an interference with th
08.08.07.02.htm 08.08.07.02. 02 Removal of Safety Hazards.. The Department may immediately remove, or the lake manager may order the immediate removal of, a safety hazard on the buffer strip or in the lake. The lake manager shall notify the permittee or other responsible person by certified mail. The person responsible for creating the safety hazard shall be liable to the Department for all costs of removal and damage to the lake or buffer strip, or both.
08.08.07.03.htm 08.08.07.03. 03 Removal by Department.. A. Upon failure of a person to remove a structure or facility within 30 days after notice to remove is sent by the lake manager, the Department may have the structure or facility removed. The person shall be liable to the Department for the cost of removal and storage.B. A person who places or maintains a dock, mooring buoy, or other facility without first obtaining a permit from the lake manager, or after suspension or revocation of a perm
08.08.07.04.htm 08.08.07.04. 04 Reclamation.. A person may reclaim a dock, mooring buoy or structure removed and stored by the Department by reimbursing the Department for the cost incurred. If a person fails to reclaim the property within 6 months of its removal, the Department may dispose of the property.
08.08.07.05.htm 08.08.07.05. 05 Failure to Comply.. If the lake manager orders removal of the structure, facility, safety hazard, dock, or mooring buoy and the permittee fails to comply within the time allowed, then the bond in COMAR 08.08.05.05A(4) if required, shall be forfeited and the proceeds applied to:A. Removal;. B. Damages to the lake or buffer strip, or both; and. C. Storage..
08.08.07.9999.htm 08.08.07. Administrative History Effective date: May 5, 1986 (13:9 Md. R. 1024). Regulation .01A amended as an emergency provision effective April 29, 2000 (27:10 Md. R. 963) amended permanently effective May 29, 2000 (27:10 Md. R. 965)Regulation .02 amended effective July 10, 1989 (16:13 Md. R. 1419). Regulation .03A amended effective July 10, 1989 (16:13 Md. R. 1419). Regulation .05 adopted effective July 10, 1989 (16:13 Md. R. 1419).
<< Back | Return to Main COMAR Search Page